Technical manual – Flowserve AKH2 IOM Atomac Lined Ball Valve IOM User Manual

Page 21

Advertising
background image

AKH2 -

atomac ball valve - full port

Ahaus GmbH

von-Braun-Straße 19a

D-48683 Ahaus

Postfach 1162 D-48661 Ahaus

Telefon: +49(0) 2561-686-100

Fax: +49(0) 2561-686-200

Register:

2

Page:

22

Date:

12.1995

Revision:

02.2009

Technical Manual

AKH2/DA

Seat ring with pressure compensation grooves

Nut a < DN 25 = 1,5 mm

Nut a < DN 65 = 2,0 mm

Nut a > DN 65 = 3,0 mm

1. R e c l e a n i n g

The ball valve should be thouroughly cleaned with a clean, dry, lint-free towel and

blown off with dry nitrogen gas. This will assure that the valve is free from moisture,

grease and other media before packing.

2. P a c k i n g

Prior to packing, the ball valve should be jig welded in a PE-foil (0.2 mm thick).

The bag contains desiccants acc. to DIN 55473, quantity acc. to DIN 55474 and a

moisture indicator.

Advertising