Assembly instruction - akh2/da, Technical manual, Assembly instructions akh2/da – Flowserve AKH2 IOM Atomac Lined Ball Valve IOM User Manual

Page 22

Advertising
background image

AKH2 -

atomac ball valve - full port

Ahaus GmbH

von-Braun-Straße 19a

D-48683 Ahaus

Postfach 1162 D-48661 Ahaus

Telefon: +49(0) 2561-686-100

Fax: +49(0) 2561-686-200

Register:

2

Page:

23

Date:

12.1995

Revision:

02.2009

Technical Manual

Assembly Instructions AKH2/DA

The general installation and maintenance instructions must be observed.

Attention, please take care of the tight direction of indicator while assembly.

1. Screw stud bolts

(120) into body (010).

2. Insert stem

(040) from inside of body in such a way that the flat side is paral-

lel to body longitudinal axis.

3. Insert chevron packing

(100).

4. Install gland insert

(065), gland follower (060), safety washers (150), hexa-

gon nuts

(110) and grounding strap (170) also on valves with actuator.

5. Install hand lever

(070) on to stem (040) and tighten it using lock washer

(130) and hexagon bolt (140).

6. Insert first ball seat ring

(030) into body (010).

7. Insert ball

(050) to valve stem by pushing the ball in a downward motion

through valve body.

8. Turn hand lever 90° of longitudinal axis of

body.

9. Install ball seat ring with pressure compen-

sation grooves

(035) on to ball (050).

10. Install side piece

(020) on to body (010),

making sure that recess for stem is on the

correct side.

11. Install body bolts

(080) and hexagon nuts

(090) and tighten by crisscross method to

recommended torques.

12. Assemble stop

(210) with hexagon bolt

(220).

Disassembly instruction see

register 2, page 10

Advertising