Assembly instructions akh2a, Technical manual – Flowserve AKH2A Atomac Lined Ball Valve IOM User Manual

Page 6

Advertising
background image

AKH2A -

atomac ball valve

Ahaus GmbH

von-Braun-Straße 19a

D-48683 Ahaus

Postfach 1162 D-48661 Ahaus

Telefon: +49(0) 2561-686-100

Fax: +49(0) 2561-686-200

Register:

13

Page:

6

Date:

12.1995

Revision:

08.2009

Technical Manual

DN 1“ to 2“ = quadrangular Flange

DN 3“ and 4“ = sexangular Flange

Assembly Instructions AKH2A

The general installation and maintenance instructions must be observed.

1. Screw stud bolts

(120) into body (010).

2. Insert stem

(040) from inside of body in such a way that the flat side is parallel to

body longitudinal axis.

3. Insert chevron packing

(100).

4. Install gland insert

(065), gland follower (060), safety washers (150), hexagon nuts

(110) and grounding strap (170) also on valves with actuator.

5. Install hand lever

(070) on to stem (040) and tighten it using lock washer (130) and

hexagon bolt

(140).

6. Insert first ball seat ring

(030) into body (010).

7. Insert ball

(050) to valve stem by pushing the ball in a downward motion through

valve body.

8. Turn hand lever 90° of longitudinal axis of body.

9. Install second ball seat ring

(030) on to ball (050).

10. Install side piece

(020) on to body (010).

11. Install body bolts

(080) and hexagon nuts (090) and tighten by crisscross method to

recommended torques.

12. Assemble stop

(210) with hexagon bolt (220).

Advertising