Attention

The seating surfaces of the threads or flange provided on the vessel or boiler standpipe

must be accurately machined,

Fig. 5.

Do not bend electrode tips when mounting.

Do not include electrode body in the thermal insulation of the boiler.

Note

For the approval of the boiler standpipe with connecting flange the relevant local and

national regulations must be considered.

See four examples of installation on page 3.

Tools

Open-end spanner 4 mm A. F.

Bolt cutter

Hacksaw

Flat file, medium cut

Installation

ER 50-1, ER 56-1

. Determine required measuring lengths of the electrode tips and enter data in the

table “Functions”,

Fig. 4.

. Cut electrode tips

1 , 2 , 3 and 4 accordingly.

3. Deburr faces of electrode tips.
4. Strip off 50 mm of PTFE insulation from the ends of the electrode tips.
5. Check seating surfaces of threads or flange provided on vessel or boiler standpipe,

Fig. 5.

6. Place joint ring

3 onto seating 2 of the electrode, Fig. 4.

Use only joint ring (of stainless steel .430) D 33 x 39 to DIN 7603 supplied with electrode.

7. Apply a light smear of silicone grease (e. g. DOW Corning  Compound) to electrode thread

4.

8. Screw level electrode into threads or flange provided on vessel or boiler standpipe and tighten with a

4 mm open-end spanner. The torque required is 40 Nm when cold.

Table “Functions”

Please enter data.

Function

Function

Electrode tip

Length [mm]

Reference electrode



e. g. pump OFF



e. g. pump ON

3

e. g. high-level alarm

4