Flowserve NRG 16-19 User Manual

Page 5

Advertising
background image

5

Explanatory Notes

Scope of supply

NRG 16-19

 Measuring electrode NRG 6-9

 Joint ring D 7 x 2 to DIN 7603 (made from .430), form A, bright annealed

 Installation manual
NRG 16-27

 Measuring electrode NRG 6-27

 Joint ring D 7 x 2 to DIN 7603 (made from .430), form D, bright annealed

 Installation manual
NRG 16-28

 Measuring electrode NRG 6-28

 Joint ring D 24 x 29 to DIN 7603 (made from .430), form A, bright annealed

 Installation manual

Description

The measuring electrode fitted in the steam trap or in a separate test chamber monitors the steam trap

for banking-up of condensate and loss of live steam.
The measuring electrodes NRG 6-27, NRG 6-28 feature an additional temperature sensor for

detecting the condensate temperature.
The test station NRA -3 is designed for the connection of up to max. 6 measuring electrodes.

Function

The following electrodes can be used for monitoring steam traps:

n

Measuring electrodes NRG 6-27, NRG 6-28 for detecting loss of live steam (electrode exposed)

and banking-up of condensate (by measuring the temperature of the condensate) or

n

Measuring electrode NRG 6-9 for detecting banking-up of condensate

or loss of live steam

(electrode exposed or immerged).

The measuring electrode NRG 6-27, NRG 6-28 works according to the conductivity measurement

principle and signals electrode exposed or immerged. The equipment is also equipped with a tem-

perature sensing element PT 000 for measuring the temperature of the condensate. The measuring

electrode is installed either directly inside the steam trap to be monitored or in the separate test

chamber VKE 6 mounted upstream of the steam trap.
Faulty steam traps cause either banking-up of condensate or loss of live steam. Both conditions will be

detected by the measuring electrode and indicated and evaluated by the test station NRA -3.
The measuring electrode NRG 6-9 works according to the conductivity measurement principle, too.

Depending on the installation the electrode detects either loss of live steam or banking-up of conden-

sate. The readings are then evaluated by the test station NRA -3 or by the level switch NRS -2.