. Take care of correct position of installation.
2. Take care of flow direction. The flow arrow is on the trap body.
. Consider space required for opening trap. When the trap is installed a minimum space of

100 mm

is required for removing cover

C.

4. Remove plastic plugs. They are only used as transit protection.
5. Clean seating surfaces of both flanges.
6. Install steam trap.

Flanged design

. Take care of correct position of installation.
2. Take care of flow direction. The flow arrow is on the trap body.
. Consider space required for opening trap. When the trap is installed a minimum space of

100 mm

is required for removing the cover

C.

4. Remove plastic plugs. They are only used as transit protection.
5. Remove regulator as described under

Maintenance.

6. Clean socket-weld ends.
7. Arc-weld trap only manually (welding process  and 4 in accordance with DIN EN 2406).

Socket-weld design

Installation

The steam trap BK 27N can be installed in horizontal or vertical position, but the flow direction arrow
must be taken into account. In the case of a horizontal installation, the cover should be at the top.