Operation – Flowserve FPS 14 User Manual

Page 2

Advertising
background image

Operation

Maximum operating pressure: 150 psig

1. At the beginning of the cycle, the float ball

(4.2) is at its lowest position. The vent

valve (4.4) is open and the pressure valve

(4.3) is closed.

2. The liquid to be pumped enters the pump

tank by gravity through the inlet check

valve. As the pump fills, the float ball (4.2)
rises. The outlet check valve prevents back

flow of liquid into the pump tank from the

downstream side.

3. At the high trip point the mechanism

snaps over center. The compressed coil

spring (4.5) simultaneously closes the vent
valve (4.4) and opens the pressure valve (4.3). The motive gas flows through the pressure valve

(4.3) and pushes the liquid out of the pump tank though the outlet check valve. The inlet check

valve prevents liquid from flowing back into the upstream piping.

4. As the liquid falls, the float ball (4.2) drops. At the low trip point, the mechanism snaps over

center and the compressed coil spring (4.5) simultaneously opens the vent valve (4.4) and

closes the pressure valve (4.3). The pump tank depressurizes as the motive gas is relieved
through the vent valve.

5. After the pressure in the pump tank is relieved through the

vent valve (4.4), flow resumes through the inlet check valve

and a new cycle begins.

Advertising