Installing direct pulse out interface board – Gasboy 9852K User Manual

Page 6

Advertising
background image

Page 6

MDE-5151 Direct Pulse Out Option Installation Instructions for Atlas™ 9852K/9853K Pumps/Dispensers · March 2014

Installing Direct Pulse Out Interface Board

Installing Direct Pulse Out Interface Board

Installing Direct Pulse Out Interface Board

To install the direct pulse out interface board, proceed as follows:

1

Unlock and remove the front panel.

2

Remove the two bolts located over the tabs of the bezel assembly. Lift the bezel assembly
upward and out to remove.

3

Loosen and remove the two screws located on the left and right display panel brackets and
pivot the display panels down.

4

Pull the connector off P1 on the power supply. After a few seconds, reconnect P1.

Figure 1: Pump Central Processing Unit (CPU) Board

P1

5

Disconnect the cables from the P3, P4, and P5 connectors on the pump CPU board. Disconnect
the pulser(s) from the Adaptor Cable (M05201A001).

Advertising
This manual is related to the following products: