Installation – Montigo MW38 DV User Manual

Page 5

Advertising
background image

MW38-DV Modular Fireplace

P/N XG0112

Page 5 of 19

Installation

Installing Terminations with Built-In Frames

11

11

1.

Frame the termination opening to 11" x 11".

2.

Fasten the termination to the studs using a minimum of 4
screws.

1. For the MSR, frame the termination opening to 12" x 12".

For the BSR, frame the termination opening to 11" x 11".

2. Fasten the MSR or BSR to the studs using a minimum of 4 screws.

3. Attach the termination to the frame as shown here, and secure by

screwing through the four pilot holes in the termination.

12

12

MSR shown

Inset - BSR frame.

Installing Terminations with MOSR Frames

The MOSR is a frame for installing terminations from the interior of a
building. Use it for installations such as high rises, where the

termination may not be easily installed from the building's exterior.

1.

Frame the termination opening to 12" x 12".

2.

Fasten the MOSR frame to the interior side of the studs using a
minimum of 4 screws.

3.

Insert the termination into the MOSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.

12

12

12

MOSR

Installing Terminations with MSR or BSR Frames

The MSR Frame is for use with stucco or siding exteriors, and the
BSR is for use with brick exteriors. The BSR is available in 4" or 6"
depths.

MTO-3F

MTO-3

MTO-3

MTKOG

1.

Ensure that the two long mounting brackets are facing the
bottom of the termination. (See inset). This will provide more
heat protection at the top of the termination, where temperatures
are highest.

2.

Attach to the faceplate of the termination using four sheet metal
screws.

Installing Heat Guards over Terminations

Advertising