MovinCool CM12 Service Manual User Manual

Page 66

Advertising
background image

Repair Section

66

(3) Checking vacuum

1) Leave the high pressure valve and the low

pressure valve of the gauge manifold closed for
five minutes or more, and confirm that the gauge
pointer does not return to zero.

2) If the gauge pointer returns gradually to zero

there is a leak somewhere in the system (this
could also include gauge manifold). Perform a
leak check according to the procedure indicated
in the next step. Once the leak has been found
and repaired, evacuate the system once more to
confirm that the system holds vacuum.

I003203

Return

Pipe Brazing

Leave valves closed for 5
minutes or more. Pointer of
pressure gauge returning to
zero indicates there is a leak.

LO

Closed

HI

Closed

Valve Setting

Pressure Gauge

Advertising