Installation

Receiving & Unpacking Equipment

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.

Nortec assumes no responsibility for any material shortages beyond this period.

3 Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper

promptly.

5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or

loss claims are to be made directly to the shipping company.

Location of the humidifier in an air conditioning system

Reference the following systems for humidifier location:

Up flow affect

The up flow affect is a result of the air velocity versus the steam velocity leaving the orifices of
the distributor.
The air velocity is a product of the volume flow rate through a present cross sectional area. The
steam velocity leaving the orifices is directly proportional on the internal pressure, inside the
distribution tube. This pressure is reduced when two or more distributors are in use.

The following up flow guidelines has been established from testing:

Velocity

Inlet Steam Pressure

Up Flow Distance

500

15

2 ft

1000

15

1 ft

500

30

4 ft

1000

30

2 ft

These up flow distances are only guidelines. Every application presents a multitude of variables
which may shorten or lengthen the up flow distance. The location of the distributor may need to
be changed if condensation occurs.

Figure 1: Top View