7 condensate drainage connection and safe drainage, Condensate drainage connection and safe drainage, 7condensate drainage connection and safe drainage – REMKO BL 262 DC User Manual

Page 29

Advertising
background image

7

Condensate drainage

connection and safe

drainage

3

2

4

9

5

5

11

100

6

8

7

10

10

12

12

1

Fig. 39: Condensate drainage, seepage of conden-

sate and strip foundation (cross-section)

1:

Outdoor unit

2:

Leg

3:

Condensate collection tray

4:

Floor bracket

5:

Reinforced strip foundation

HxWxD = 300x200x800mm

6:

Gravel layer for seepage

7:

Condensate drainage heating

8:

Drainage channel

9:

Conduit for refrigerant piping and electrical

connecting line (temperature-resistant up to at

least 60°C)

10: Frost line

11: Drainage pipe

12: Soil

E

B

B

A D

C

11

1

5

5

8

1

9

3

Fig. 40: Dimensions for the strip foundation (bird's

eye view)

For the designations of 1,3,5,8,9 and 11, please

refer to the legend for the Fig. 39

dimensioning of the strip foundation

Dimen-

sion

Value in mm

A

800

B

200

C

530

D

290

E

330

Condensate drainage connection

If the temperature falls below the dew point, con-

densation will form on the finned condenser

during heating mode.

A condensate tray should be installed on the

underside of the unit to drain any condensate.

n

The condensate drainage line should have an

incline of min. 2%. This is the responsibility of

the customer. If necessary, fit vapour-diffusion-

proof insulation.

n

When operating the unit at outside tempera-

tures below 4 °C, ensure the condensate

drainage line is laid to protect it against frost.

The lower part of the housing and condensate

tray is also to be kept frost free in order to

ensure permanent draining of the condensate.

If necessary, fit a pipe heater.

n

Following installation, check that the conden-

sate run off is unobstructed and ensure that the

line is durably leak tight.

29

Advertising
This manual is related to the following products: