REMKO GPM

The following instructions for
installation and set-up of the units
are intended exclusively for
authorised technicians.
All safety notes must be observed
without fail.

General information

Normally the units can be installed
directly in the room to be heated.
With set-up of the units, the
guidelines of the regional building
regulations (LBO) and combustion
plant order (FeuVO) of the
respective state must be observed.
The first enactment of the
(German) Federal Emission
Control Act (1st BlmSchG) and
the statutory provisions of the
ordinance over small combustion
plants (1st BlmSchV) must also be
applied.
The installation of fan-assisted
heaters operated with gas burners
is prohibited in the following
spaces:

In public function rooms or in

rooms with a concentration of
people greater than 0.4 per
square metre.

In rooms where gas or dust

can accumulate through the
processing that takes place
there or through the materials
stored there, which could lead
to fire or explosion

In garages or in large stores

Installation instructions

The minimum height and clearance
of the fan-assisted heater from the
walls and floor can be gathered
from the drawing below.

The minimum clearances are
the necessary distances for
maintenance. All measurements
are given in mm. The height [2500
mm] corresponds to the minimum
height indicated for "Hanging
equipment" by the guidelines.

Two different types of brackets
are available for the installation as
accessories:
Fixed and pivoting.

The order numbers for the wall
installation brackets (pivoting
design) are:

Computerised part no.:
228761; GPM 15/35

Computerised part no.:
228762; GPM 55

Computerised part no.:
228762; GPM 75

200

1000

40

0

25

00

So that no dangerously high
temperatures are reached, the
distance between the exterior
surface of the equipment and
flue gas pipe and potentially-
accumulated flammable material
may be no less than 1.5 m, with
a ground clearance of 2.5 m or
greater.

Units with gas burners for gas with
a thickness greater than 0.8 (liquid
gas, propane, butane) may only be
installed in rooms where the floor
does not lie below ground level.

Ventilation openings

The rooms where gas-powered
units are operated must have one
or more permanent openings
(windows or doors).

These openings must be arranged
in the following places:

- directly below the ceiling with

gases with a thickness less than
0.8:

- directly above the floor with

gases with a thickness greater
than or equal to 0.8..

The openings must be arranged
on exterior walls in open air. For
the size of the cross-section,
the installed heat output is
authoritative.

Instructions for the installer

We reserve the right to modify the dimensions and constructional design as part of the ongoing technical development process.