TS Performance 2110304 User Manual

Page 2

Advertising
background image

Continued

Installation of the TS Performance Power Play Mp-8

6.7L Cummins

Read all instructions and fully understand them before installing you TS Performance MP-8 module.

Disconnect the battery terminals and remove keys from ignition before installation.

Place Di-Electric Grease onto every electrical connection.

1. Remove the dipstick and 4 bolts holding the plastic cover plate on top of the

engine.


2. Using an 11mm wrench remove

the 2 clamps holding the EGR tube
that crosses in front of the valve
cover. You do not have to remove
the tube only tilt the tube up
towards the front of the truck.





3. Using a 10mm socket and wrench,

remove the bolt that holds the
dipstick tube to the bracket and the
6 bolts that hold the air horn to the
manifold. Making sure not to
damage the gasket, slide the air
horn forward so that you can access
the front of the fuel rail.

4. Remove the 18mm fuel rail valve

located on the front of the fuel rail.


5. Take valve and thread supplied nut

tool onto valve. Then place valve in a
vice, clamping down on sides of
valve cap.




Advertising