AEC TCU Series Open Reservoir Water Temperature Control Units User Manual

Page 14

Advertising
background image

Open Resevoir Water Temperature Control Units

Page 15

Carefully test the condition of lifting cables, chains, ropes, slings, and hooks before using
them to lift a load.

Be sure that all non-current carrying parts are correctly connected to earth ground with an
electrical conductor that complies with current codes. Install in accordance with national and
local codes.

When you have completed the repair or maintenance procedure, check your work and remove
your tools, rigging, and handling equipment.

Do not restore power to the temperature control unit until all persons are clear of the area.
DO NOT start and run the temperature control unit until you are sure all parts are functioning
correctly.

BEFORE you turn the temperature control unit over to the operator for production, verify all
enclosure panels, guards and safety devices are in place and functioning properly.

Reporting a Safety Defect
If you believe that your equipment has a defect that could cause injury, you should
immediately discontinue its use and inform the manufacturer.

The principle factors that can result in injury are failure to follow proper operating procedures
(i.e. lockout/tagout), or failure to maintain a clean and safe working environment.



























Advertising