2 shipping information, 1 unpacking and inspection, 2 in the event of shipping damages – AEC NEC Central Station Air and Water Cooled Chiller User Manual

Page 10

Advertising
background image

NEC Series Water- and Air-Cooled Central Chillers

Page 9

2 Shipping

Information

2-1 Unpacking and Inspection

You should inspect your AEC/Application Engineering NEC Series central chiller for possible
shipping damage. If the container and packing materials are in re-usable condition, save them for
reshipment if necessary.

Thoroughly check the equipment for any damage that might have occurred in transit, such as
broken or loose wiring and components, loose hardware and mounting screws, etc. In case of
breakage, damage, shortage, or incorrect shipment, refer to the following sections.

2-2 In the Event of Shipping Damages

Important!

According to the contract terms and conditions of the Carrier,

the responsibility of the Shipper ends at the time and place of shipment.

The Carrier then assumes full responsibility of the shipment.


; Notify the transportation company’s local agent if you discover damage.
; Hold the damaged goods and packing material for the examining agent’s inspection. Do not

return any goods to AEC, Inc. before the transportation company inspection and
authorization
.

; File a claim against the transportation company. Substantiate the claim by referring to the

agent’s report. A certified copy of our invoice is available upon request. The original Bill of
Lading is attached to our original invoice. If the shipment was prepaid, write us for a
receipted transportation bill.

; Advise AEC, Inc. regarding your wish for replacement and to obtain an RMA (return

material authorization) number.

Advertising