Airaid 1025 User Manual

Page 3

Advertising
background image

11. Install the gasket on top of the ECONOAID as shown.

12. Reinstall the throttlebody onto the manifold using the facto-
ry hardware. Tighten the fasteners in a “ X ” pattern to the ve-
hicle manufacturer’s Specs. Reconnect the throttlebody motor.
Manually rotate the throttle plate 90 deg. To verify that you
have the full range of motion and there is no obstruction.

14. Reinstall the engine cover and Double check your work.
Make sure there is no foreign material in the intake tract. Make
sure all clamps, hoses, connectors, nuts, and bolts are secure.
Reconnect the negative battery cable.

13. Re install all of the factory intake components in the re-
verse order in which they were removed and re connect the
PCV breather line.

10. Install the ECONOAID onto the intake manifold as shown,
with the logo facing up and the teeth pointing downward into
the manifold.

9. Lift the throttlebody up and off of the intake manifold and
gently lay it on it’s side as shown.

PCV breather

Advertising