System power up, Configuration – Grass Valley Krystal Multi-Channel User Manual

Page 6

Advertising
background image

4

Krystal Multi-Channel Upgrade

Figure 1. Video Processor Hardware ID

System Power Up

Power up the components of your system in the following order:

1.

All Video Processor frames

2.

System Controller frame (wait 45 seconds for initialization)

3.

All Control Panels

Configuration

You need to install each new channel (in software) so the system recognizes
the available hardware.

1.

Acquire an Effect Manager.

2.

Install the physical channels:

System Setup

\

SYSTEM CONFIG >

\

OK

\

CHANNEL CONFIG >

. Select

TRUE

for all the channels present. You must

exit from the menu to save this change to NV RAM. Press the

Exit

button.

3.

Make any other configuration changes required for your system, then
save the configuration files to NV RAM and to floppy disk. Refer to the
latest Krystal Software Release notes for specific procedures.

POWER

DC

0

Hardware ID

0868_01

Advertising