Order of setup, 3 sof tw a re set u p – HEIDENHAIN ND 1200 User Manual

Page 88

Advertising
background image

88

2 Installation and Specifications

2.3 Sof

tw

a

re

set

u

p

Order of setup

The ND 1200 setup software is contained on up to 18 screens,
depending on the hardware configuration. It is possible that not all the
setup screens described in this chapter are active in your system.
Disregard screen descriptions that do not apply to your ND 1200.

The initial ND 1200 setup tasks should be performed in the order listed
here. Instructions are presented in this order on subsequent pages.

The additional setup tasks can be performed in any order.

ND 1200 setup configurations can be saved on USB drives

Initial setup tasks

Setup screens

1: Language selection and product version information

About

2: Supervisor password entry and program unlocking

Supervisor

3: Encoder configuration

Encoders and Misc

4. Loading settings files and startup screens (instead of manual setup)

Supervisor

5: Optical edge detection setup (optional)

Misc screen and Edge soft key menu

6: Stage squareness calibration

Squareness

7: Error correction

LEC, SLEC or NLEC screen

8: Measurement scaling for parts that expand or shrink

Scale factor

9: Measurement configuration

Measure

10: Display formatting

Display

Remaining setup tasks

Setup screens

Hot key assignments

Hot keys

Print formatting

Print and Form characters screens

RS-232 Port configuration

RS-232

USB port configuration

USB

Audio configuration

Sounds

Key repeat delay

Misc

Time and date

Clock

Saving settings

Setup screens

Saving settings files and ND 1200 programs

Supervisor

Advertising