ShoreLand'r SLXR40TCBXLW User Manual

Page 8

Advertising
background image

Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028

www.shorelandr.com

0004281

Page

8

of

16

10/28/2010































R SERIES
The R-series roller rack is installed by placing the roller
arm assembly mounting channel over the rear cross
member and securing in place with a 1/2” x 4-1/2” hex
bolt and lock nut. (See Diagram A). Note that it should
be left loose until the boat is placed on the trailer. Once
the proper position is determined, it may be tightened.
Repeat on the other roller arm assembly.

The short stabilizer bunk is installed to the adjustable
bunk bracket on the front cross member with a 3/8” x 1”
hex bolt and lock nut. (See Diagram A).

Advertising