Equator 375 User Manual

Page 20

Advertising
background image

The Blowing Process of the System. the Filling Sta-
tion and the Vacuum Pumo and Opening of the Sys-
tem

7. Drilling and tapping of the process pipe.
8. Connect dry nitrogen and equalize the pressure in

the system.

9. Open the valve on the tongs at the filter drier and

the spherical valve (18).

10. Open the valve for the filling station (11).
11. Slowly open the valve for the vacuum pump (12)

and blow the system, the filling station and the
vacuum pump through.

12. The system can then be opened with capillary

tube scissors.

18.

Advertising