Before using, Mounting (see fig. c), Setting up the pulley function (see fig. d–g) – Parkside PSZ 250 B2 User Manual

Page 8: Operation, Putting the cable hoist into service, Operating the cable hoist

Advertising
background image

8 GB

Before beginning, verify the steel cable

6

is

wound around the drum

3

correctly and the

clearance between the turns is smaller than the
steel cable (Fig. B).

Before using

Mounting (see Fig. C)

Secure the cable hoist to a square pipe / boom

using the 2 mounting brackets

1

. The dimensi-

ons of the square pipe / boom must correspond
with the size of the mounting bracket

1

and

must be able to bear double the rated load.
Note: We recommend contact a qualified
technician for this purpose.

Screw the mounting brackets

1

to the cable

hoist (also see Fig. C).

Tighten all screws.

Note: A qualified technician should inspect
the anchor of the square tube / boom before
putting the device into service.

Note: The cable hoist motor

14

is equipped

with a thermostat switch. The motor

14

may there-

fore stop whilst operating the cable hoist; it will
automatically restart once it has cooled down.

Setting up the pulley function

(see Fig. D–G)

The cable hoist is equipped with a pulley

15

and

an additional hook

16

. When used correctly, the

cable hoist can lift double the load.

Install the pulley

15

and additional hook

16

as shown in figures D–G.

Hook the fixed hook

8

into the fixing opening

2

(see Fig. G). The load will now be lifted with

two steel cables and the cable hoist can there-
fore lift double the load.

Operation

Putting the cable hoist

into service

The user must hoist the load from the ground at

the slowest possible speed. The cable must be
tightened when the load is being hoisted.

Secure the device with a 10 A fuse or a 10 A

earth leakage circuit breaker to protect the
electric circuit.

Before beginning, verify the steel cable

6

is

wound around the drum

3

correctly and the

clearance between the turns is smaller than the
steel cable (Fig. B).

Remove the adhesive tape from the cable drum

3

prior to first use.

Ensure the load is properly secured to the hook

8

or, for pulley operation, the additional hook

16

, and always maintain a distance to the

load and the steel cable

6

.

Operating the cable hoist

Check if the emergency stop switch

9

is

pressed.

Turn the emergency stop switch

9

clockwise

to release.

Press the push button ▲

10

to hoist the load

(see Fig. H).

Press the push button ▼

10

to lower the load

(see Fig. H).

Auto-stop mechanism lever

5

When the maximum hoisting height has been reached,
the shut-off weight

7

will push the lever

5

upward.

This engages a limit switch and the load can no
longer be hoisted.

Maximum cable length lever

4

When the load reaches the lowest possible position,
an end switch is activated, preventing the load from
being lowered further. This end switch also prevents
the cable hoist from being operated in the wrong
direction (hook moving opposite of the direction
indicated on the push button

10

).

Operation / Cleaning, maintenance and ordering spare parts / Disposal

Safety notices specific to the device / Before using / Operation

100684_par_Seilhebelzug_content_PL_SI_SK_NL.indd 8

02.07.14 12:41

Advertising