Fig.3, Fig.2 – Sealey TPSJK User Manual

Page 2

Advertising
background image

NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

iMPortant: no liability is accepted for incorrect use of this product.

Warranty: Guarantee is 12 months from purchase date, proof of which will be required for any claim.

inForMation: for a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.

01284 757500

01284 703534

[email protected]

sole UK Distributor, sealey group,

Kempson Way, suffolk Business Park

,

Bury st. Edmunds, suffolk,

IP32 7Ar

www.sealey.co.uk

Web

email

4.9 back to back Configuration - this manual has described

how to build this storage system side by side but its possible to

build with each unit back to back.

4.9.1 to do this build the storage system as described but instead of

putting the double uprights on the right short side of the frame

configure to the long back side of the frame.

4.9.2 then build up as fig.3 and install the rest of the shelf beams.

4.9.3 finally place wire shelves onto frame starting with the shelf for

the larger bins at the bottom and working up.

follow from section

4.2. from tPs22, tPs36 instructions.

fig.3

Original Language Version

tPsJK Issue: 1 - 09/02/11

4.6 using the double uprights as a start point, build up the other

half to the storage system, use fig.4 or fig.5 for reference and

follow from section

4.2. from tPs22, tPs36 instructions.

fig.2

Advertising