Setup, Unpacking, Disposal of the packaging – Silvercrest SDS 3000 A1 User Manual

Page 7: Setting the tripod up

Advertising
background image

5

SDS 3000 A1

GB

Setup

Unpacking

Remove all parts of the tripod and the operating instructions from the

packaging.

Remove all packing material.

Disposal of the packaging

The packaging protects the appliance from transport damage. The packaging
materials are selected from the point of view of their environmental friendliness
and disposal technology and are therefore recyclable.

The return of packaging into the material circuit saves on raw materials and
reduces the amount of generated waste. Dispose of packaging material that
is no longer needed according to the regionally established regulations.

Setting the tripod up

Open the tripod out completely, so that the locking ring

1)

w touches the

column end..

Turn the locking ring

2)

w fi rmly in a clockwise direction so that it can no

longer move.

Loosen the locking levers

3)

e+r to unlock the legs of the tripod and pull

them out to the required lengths.

Align the tripod by shifting the legs as required. For this use the levelling spirit

4)

level 6.

NOTICE

The air bubble must be located in the middle of the circular marking.

When you have found the right position, relock the tripod legs with the

5)

locking levers e+r.

Now align - if you want to have the tripod plate

6)

3 lined up exactly hori-

zontally - the tripod plate 3. For this, turn on the grip 0 and move it up or,
respectively, down.

NOTICE

The air bubble of the adjustment spirit level

4 must be located between

the two markings.

IB_71271_SDS3000A1_LB4.indb Abs3:5

IB_71271_SDS3000A1_LB4.indb Abs3:5

12.10.2011 9:31:37 Uhr

12.10.2011 9:31:37 Uhr

Advertising