Operation – MCZ Tube 2013 User Manual

Page 28

Advertising
background image

A

26

6-OPERATION

It is good practice to guarantee effective ventilation in the room during the initial start-up, as the stove will emit

some smoke and smell of paint.

Do not stand close to the stove and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,

they are not harmful in any case.

The stove will be subject to expansion and contraction during the start-up and cooling phases, therefore light creaking noises may be

heard.

This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.

It is extremely important to make sure the stove is not immediately overheated and the temperature is increased gradually starting from

the low power.

This will prevent damaging the ceramic or serpentine tiles, the welds and the steel structure.

DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!

SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP

Once the power cable is connected on the rear side of the stove, bring the switch to position (I). Switch the stove on and off by pressing key

A on the remote control and LED B or C on the emergency panel will light up according to the mode of the stove.

Advertising
This manual is related to the following products: