MCZ De Chirico User Manual

Page 12

Advertising
background image

INSTALLATION AND USE MANUAL

Chapter 3

DE CHIRICO

page

12

Chapter 3

Technical service – all rights reserved by mcz spa
Reproduction prohibited

3.7. PHASE 6 - ASSEMBLY OF FRAME SUPPORT (element 5)

Place the frame support (element 5) with the opening aligned with Forma Puro115, 10 mm from the hood

support,10 mm from each side and 20 mm from the edge-cover profile (see figure).
Fasten the frame support to the wall using the plasterboard screws provided (12) and using the holes that are

already present. If the wall has been constructed as per paragraph

3.6. Phase 5, the screws will be located at the

steel uprights.













Advertising