3.3. PHASE 2 – PREPARATION OF COUNTER-WALL

Before proceeding with the installation of the Picasso cladding, you must create the counter-wall:

  for this

purpose, consider an external distance from the fireplace stove of about 27-30 mm. This measurement must be

measured based on elements 1 (steel structure), 2 (lh side frame) and 3 (rh side frame).
Make an opening on the front part of H=1200 mm and L=850 mm; reinforce the counter-wall with metal uprights

placed flush with the hole in a vertical direction and resting on the floor. For greater safety you can use 1+1

uprights per side.
Drill a hole in the counter-wall at the M6 threaded bars at the rear of each marble component. Six holes are

required, located as shown in the figure below.

N.B. The dimensions shown in the figure are approximate and must be verified in situ

165

1200

65

850

1562

1292

250

MONTANTE

MONTANTE

FORI DA REALIZZARE
SULLA CONTROPARETE
PER FISSAGGIO PICASSO

DISTANZA DI

SICUREZZA

27

MONTANTE

MONTANTE

CONTROPARETE

MURO PERIMETRALE

MURO PERIMETRALE

MONTANTE

MONTANTE

A FILO FORO



Advertising