Installation and operation, cont’d, Connections and switches – Extron Electronics RGB 192 User Manual

Page 8

Advertising
background image

RGB 190F, RGB 192, and RGB 198 • Installation and Operation

RGB 190F, RGB 192, and RGB 198 • Installation and Operation

Installation and Operation, cont’d

2-5

2-4

3

.

Hold the interface with attached brackets against the
underside of the desk/table. With a soft pencil mark the
location of holes for screws on the desk based on the
following:

For the RGB 190 and RGB 192, mark the opening
approximately 1.0" x 5.7" ( 2.5 cm x 14.5 cm).

For the RGB 198, mark the opening approximately
1.75" x 13.0" (4.5 cm x 33.0 cm).

MO

NIT

OR

H-

S

HIF

T

S

ER

R

DD

S

P

NO

M

ON

.

M.

AU

DIO

S

OG

LE

VE

L

RG

B 1

92

CO

MP

UTE

R

AU

DIO

1

ON

2

3

4

5

6

Figure 2-2 — Through-desk mounting

4

.

Cut out the material from the installation area with a
jigsaw. Check the opening size by inserting the interface
part way through the hole. If needed, use a saw, file or
sandpaper to enlarge the hole. Smooth the edges of the
hole with sandpaper.

5

.

Drill pilot holes 1/4" (6.4 mm) deep, and 3/32" (2 mm)
diameter in the underside or inside (concealed side) of the
furniture where the interface will be located.

6

.

Secure the interface to the desk with the provided wood
screws.

7

.

To adjust the height of the interface within the desk, slide
the interface up or down to the desired position, then
tighten the screws that attach the brackets to the interface.

Rack mounting (RGB 198 only)

1

.

Remove rubber feet if they were previously installed on
the bottom of the interface.

2

.

Mount the interface on either side of an 19" 1U Universal
Rack Shelf (part # 60-190-01) using two 4-40 x 3/16"
screws to secure it to the shelf. See figure 2-3.

3.

Install blank panel(s) or other unit(s) on the rack shelf.

4.

Attach the rack shelf to the rack using the supplied bolts.

6" Deep Rack Shelf

Front false
faceplate
uses 2
screws.

1/4 Rack Width Front False
Faceplate

Use 2 mounting holes.

(2) 4-40 x 3/16"
Screws

H -S

H IF

T

S ER

R

D D

S P

N O

MO

N .

M .

AU

D IO

S O

G

L E

V E

L

C O

M P

U TE

R

I NP

U T

M O

N IT

O R

O U

T PU

T

AU

DIO

1

ON

2

3

4

5

6

125

V

50

/60

Hz

5A

125

V

50

/60

Hz

5A

RG

B 1

98

UN

IVE

RS

AL

IN

TE

RFA

CE

Figure 2-3 — Rack mounting

Connections and Switches

Figures 2-4 and 2-5 show the front and rear panel of the
RGB 192 and the RGB 198, respectively. With the exception of
audio features (numbers

2

and

9

), all numbers for figure 2-4

pertain to both the RGB 190 and 192 models.

1

Power indicator

Amber

— Indicates power is applied.

Green

— Indicates that power is applied and a sync signal is

present on the input.

H - S H I F T

S E R R

D D S P
N O M O N .

M . AU D I O

S O G

L E V E L

R G B 1 9 2

C O M P U T E R

I N P U T

M O N I TO R

L/MONO

R

AUDIO

AUDIO

1

ON

2

3

4

5

6

POWER

12-15V

1A MAX.

7

2

1

3

6

9

4

5

8

Figure 2-4 — RGB 192 front and rear panel features

Advertising