INSTALLATION

Eaton

®

9130 UPS (700–3000 VA) User's Guide

S

164201718 Rev 2

www.powerware.com

22

NOTE There are two sets of four mounting holes on each side of the UPS: a forward
position and a middle position. Choose the position that meets your configuration needs.

Mounting
Bracket

M4

8 Flat-Head

Screws (4 places)

Figure 6. Installing the Mounting Brackets (Forward Position Shown)

10. If installing optional cabinets, repeat Steps 8 and 9 for each cabinet.

11. Slide the UPS and any optional cabinets into the rack.

12. Secure the front of the UPS to the rack using two M6

16 pan-head

screws and two M6 cage nuts on each side (see Figure 7). Install
the bottom screw on each side through the bottom hole of the
mounting bracket and the bottom hole of the rail.

Repeat for any optional cabinets.

M6

16 Pan-Head

Screws (4 places)

M6 Cage Nuts
(4 places)

Figure 7. Securing the Front of the Cabinet