Installation, Inspecting your shipment, Site requirements – Enterasys Networks VH-2402S User Manual

Page 31: Inspecting your shipment site requirements

Advertising
background image

9033644

Installation 17

2. INSTALLATION

Inspecting Your Shipment

When you receive the shipment of your switch, check the package

contents and make sure you have the following items:

VH-2402S stackable switch

Mounting ears and mounting screws

Four rubber feet

ESD wrist strap

Power cord

Product documentation

Site Requirements

Before you install the switch, make sure the site meets the following
requirements:

Mounting
Provide a flat table, shelf surface, or an optional 19 in. (48.3 cm)

equipment rack.
Use an EIA standard equipment rack that is grounded and physically

secure.

Power source
Provide a power source within six feet (1.8 m) of the installation

location. This source must provide 100 VAC to 240 VAC, at 50 Hz to

60 Hz, for 80 VA minimum power. Power specifications for the switch

are shown in Appendix A, “Technical Specifications.

One 32 cm stack interconnection cable is included with
every optional Stacking Module. The 32 cm cable
(9380142) can also be ordered separately, if required.

Primary voltage selection within the above ranges is
automatic and requires no user action.

Advertising