Step 2 — software installation – Extron Electronics MLC 206 User Manual

Page 3

Advertising
background image

3

3.

To power the MLC, connect a 12 VDC power supply or an optional

MediaLink Switcher (MLS) to the MLS/Power port, and connect the power
supply or the switcher to a power source.

MediaLink Switcher

MLC/RS-232

A B

MLC 206 powered by a MediaLink Switcher

Connecting an MLC 206 to an external power supply

MLC 206
MLS/Power
port

MLC
MLS/Power
port

A B

MLS / Power

Ground ( )

+12 VDC input

0

A ground wire must be connected

between the MLC and MLS.

Ground ( )

+12VDC

Transmit (Tx)

B

Receive (Rx)

A

A B

MLS / Power

Transmit (Tx)

Receive (Rx)

+12VDC

Ground ( )

B

A

Ground all devices

An external

power supply

(12 VDC, 1 A max.)

Step 2 — Software Installation

The MLC must be configured before it can send commands to the projector or other

devices. Install the MediaLink Control Program software on the host PC. To install

the software, run SETUP.EXE from the Extron‑provided disk. Follow the instructions

that appear on the screen.

N The software is also available at

www.extron.com

.

Advertising
This manual is related to the following products: