Assembly – Husqvarna 2009-01 User Manual

Page 9

Advertising
background image

10

2. Install the bagger mount tube to the rear guard

with

5

/

16

-18 x 3¼ bolts and flange nuts from kit.

NOTE: Depending on model, rear guard hole may

need to be drilled out to

5

/

16

" if kit hardware is too

large.

3. Install kit support straps on the outside of the

mount tube as shown in the illustration. Using a

5

/

16

-18 x 1¼ bolt, attach the front side of the strap

to the fender support. Do not add flange nut at this

time. Place the reinforcement plate to the outside

of the fender support. Secure with additional 1¼

bolt and fasten both bolts with flange nuts. Repeat

steps on opposite side.

NOTE: The front side of the kit support straps

should be on the inside of the mower frame.

4. Tighten all hardware.

ASSEMBLY

1. To select the right support straps to use, measure

the mower frame just behind the casters, as

shown.

7

INSTALLING BAGGER MOUNT

Reinforcement Plate

Mount Tube

Support Strap

For frames measuring 26" use support straps A,

for frames measuring 23" use support straps B.

A

B

Drill rear

guard hole to

5

/

16

" if needed

Rear Guard

Advertising