Section 4 − installation, 1. installing work clamp, 2. process/polarity table – Hobart Welding Products Handler 125 EZ User Manual

Page 17: 3. polarity

Advertising
background image

OM-923 Page 13

SECTION 4 − INSTALLATION

4-1. Installing Work Clamp

1

Nut

2

Work Cable From Unit

3

Work Clamp

4

Screw

5

Work Clamp Tabs

Bend tabs around work cable.
6

Insulator Grip

Slide one insulating grip over work

cable before connecting to clamp.
Slide insulating grips over handles.

Ref. 802 456

1

2

3

4

5

Tools Needed:

7/16 in

6

.

Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor

weld performance and excessive heating of the work clamp.

7/16 in

4-2. Process/Polarity Table

Process

Polarity

Cable Connections

Cable To Gun

Cable To Work Clamp

FCAW − Self-shielding wire −

no shielding gas

DCEN − Straight Polarity

Connect to negative (−)

output terminal

Connect to positive (+) output

terminal

4-3. Polarity

.

Polarity must be set for DCEN
(flux core wire) only.

1

Lead Connections For Direct

Current Electrode Negative

(DCEN)

Always read and follow wire

manufacturer’s recommended

polarity, and see Section 4-2.
Close door.

Ref. 210 428

1

Advertising