Final steps, Remove the opi, Check for safety labels and signs – Hughes AN6-098P User Manual

Page 87: Subsequent steps, 69 final steps

Advertising
background image

Chapter 7 • Pointing the antenna

1037312-0001 Revision A

69

Final steps

Complete the following steps before leaving the installation site.

Remove the OPI

Remove the OPI so you can re-use it for subsequent installations:

1. Disconnect the OPI and block, if used.
2. Reconnect the receive cable to the radio.

Check for safety labels and

signs

Make sure the required safety labels and/or signs are present:

• Make sure a Radiation Hazard Caution label is present,

legible, and visible on the feed arm and on the back of the
antenna reflector.

• If the antenna is enclosed by a fence, make sure a Radiation

Hazard Caution sign is present, legible, and visible on the
entrance gate.

• If the antenna is installed on a roof with a permanently

mounted access ladder, make sure a Radiation Hazard
Caution
sign is present, legible, and visible on or near the
ladder.

Subsequent steps

The antenna is now installed and pointed, ready for operation.

To commission the IDU (remote terminal), refer to the IDU
installation manual.

Advertising