Hustler z/super z/hustler atz maintenance schedule, Hustler z shibaura diesel maintenance schedule – Hustler Turf ATZ User Manual

Page 26

Advertising
background image

25

601656_0308

WEEKLY MONTHLY

ANNUALLY OR

SERVICE AT

OR 50

OR 100

500

INTERVALS INDICATED

HOURS

HOURS

HOURS

Verify safety start interlock system

Daily

Check coolant level

Daily

Visually inspect unit for loose

hardware and/or damaged parts

Daily

Visually inspect tires

Daily

Check oil level, engine (1)

Daily or every 4 hrs.

Clean air intake screen (8)

Daily or every 4 hrs.

Clean oil heat exchanger (8)

Daily or every 4 hrs.

Check radiator screen (8)

Daily or every 4 hrs.

Check fuel level

Daily

Blades - sharpen & securely fastened

Daily

Discharge chute - securely in place &

in lowest position

Daily

Clean engine and pump compartment

Daily

Replace air cleaner paper element (5)

As needed

Grease deck pusher arms

x

Grease pump idler

x

Grease deck height pivots

x

Grease gauge wheel bearings

x

Change engine oil & filter (1) (4)

x

Clean cylinder and head fins (a)

x

Check battery connections

x

Check tire pressure with a gauge

x

Check hydraulic oil level

x

Clean engine exterior (a)

x

Clean and regap spark plugs (a)

x

Check pump and deck belt tension

& condition (6)

x

Check fuel and hydraulic lines (7)

x

Check fuel valve and grommets (7)

x

Tighten lug nuts on wheels (2)

x

Change fuel filter

x

Clean or replace hydraulic fill cap

x

Change hydraulic filter and oil (3)

x

Grease deck spindle housings

x

Replace spark plugs

x

Drain & replace engine coolant

x

Clean radiator core (8)

x

Check ROPS mounting hardware (9)

x

Hustler Z/Super Z/Hustler ATZ

Maintenance Schedule

Refer to Fig. 4-16, 4-18, 4-19 & 4-20

NOTES:

1.

Initial oil change is after 5 hours of operation. Thereafter,
change oil after every 40 hours operation. Change more often
under dusty or dirty conditions and during hot weather periods.

2.

Torque initially and after first 2 hours of operation.

3.

Perform initial hydraulic filter change after 50 hours (one week)
of operation.

4.

Change engine oil filter per the engine manufacturer’s
recommendations. Refer to Engine Owner’s Manual for
recommendations and other maintenance items.

5.

Service more often under dusty or dirty conditions. Use caution
when servicing to prevent dust contamination in the engine.
Do not clean filter element. Replace with a new one.

6.

Pump drive belt only - Inspect every 100 hours and replace
if worn or cracking is noticed. Otherwise, replace every 400
hours or 2 years
whichever comes first.

7.

Check fuel line hoses, fuel valve and grommet for any cracks
or leaks.

8.

More often under dusty or dirty conditions and during hot
weather.

9.

Inspect ROPS after the first 20 hours of operation and then
after every 500 hours of operation or yearly whichever comes
first.

REFERENCES:
a

— Refer to Engine Owner’s Manual

NOTE:

After completing maintenance cycle (500 hours), repeat cycle.

WEEKLY MONTHLY

ANNUALLY OR

SERVICE AT

OR 50

OR 100

500

INTERVALS INDICATED

HOURS

HOURS

HOURS

Check coolant level

Daily

Verify safety start interlock system

Daily

Visually inspect unit for loose

hardware and/or damaged parts

Daily

Visually inspect tires

Daily

Check oil level, engine (1)

Daily or every 4 hrs.

Clean air intake screen (8)

Daily or every 4 hrs.

Clean oil heat exchanger (8)

Daily or every 4 hrs.

Check radiator coolant level

Daily

Check fuel level

Daily

Blades - sharpen & securely fastened

Daily

Discharge chute - securely in place &

in lowest position

Daily

Check air cleaner service indicator (5)

Daily

Clean engine and pump compartment

Daily

Visually inspect radiator core (8)

x

Grease deck pusher arms

x

Grease pump idler

x

Grease deck height pivots

x

Grease gauge wheel bearings

x

Change engine oil & filter (1) (4)

x

Check battery connections

x

Check tire pressure with a gauge

x

Check hydraulic oil level

x

Clean engine exterior (a)

x

Check pump and deck belt tension

& condition (6)

x

Check fuel and hydraulic lines (7)

x

Check fuel valve and grommets (7)

x

Tighten lug nuts on wheels (2)

x

Change fuel filter

x

Clean or replace hydraulic fill cap

x

Change hydraulic filter and oil (3)

x

Grease deck spindle housings

x

Clean radiator core (8)

x

Drain & replace engine coolant

x

Check ROPS mounting hardware (9)

x

Hustler Z Shibaura Diesel Maintenance Schedule

Refer to Fig. 4-17, 4-18 & 4-19

NOTES:

1.

Initial oil change is after 50 hours of operation. Thereafter,
change oil after every 100 hours operation. Change more
often under dusty or dirty conditions and during hot weather
periods.

2.

Torque initially and after first 2 hours of operation.

3.

Perform initial hydraulic oil and filter change after 50 hours
(one week) of operation.

4.

Change engine oil filter per the engine manufacturer’s
recommendations. Refer to Engine Owner’s Manual for
recommendations and other maintenance items.

5.

Service more often under dusty or dirty conditions. Use caution
when servicing to prevent dust contamination in the engine.
Do not clean filter element. Replace with a new one.

6.

Pump drive belt only - Inspect every 100 hours and replace
if worn or cracking is noticed. Otherwise, replace every 400
hours or 2 years
whichever comes first.

7.

Check fuel line hoses and fuel valve for any cracks or leaks.

8.

More often under dusty or dirty conditions and during hot
weather.

9.

Inspect ROPS after the first 20 hours of operation and then
after every 500 hours of operation or yearly whichever comes
first.

REFERENCES:
a

— Refer to Engine Owner’s Manual

NOTE:

After completing maintenance cycle (500 hours), repeat cycle.