Operators guide, Assembly instructions (continued), Attaching a spindle drive assembly – Husqvarna 540200800 User Manual

Page 11

Advertising
background image

11

Operators Guide

Assembly Instructions (continued)

1. Remove the discharge chute.
2. Remove the right hand belt shield.
3. Remove the deck belt from the right spindle

assembly sheave.

4. Remove this sheave but keep the ¼” square

key and the two washers at hand for reinstal-
lation.

5. Install the Stepped Sheave and spacer/key

retainer included in the kit using the original
key and washers but substituting the original
7/16” HCS with the longer version provided.
An application of anti-seize is recommended.

6. Reinstall the deck belt.
7. The 5/8” hole toward the rear of the ¼” thick

discharge chute mounting bar at the right end
of the deck may be distorted from forming or
loaded with paint. Drill out or fill this hole until
it will accept a 5/8” bolt or piece of bar stock.
Keep the fit close.

8. If any weld beads or the edge of the deck top

project past the right end surface of the deck,
these must be ground back to allow the fan
assembly to fit up flush to the end of the deck.

9. Remove the 3/8” fastener, nut, and clamp from

the inside front corner of the fan assembly.

10. Remove the sheave floor to expose the fan

assembly belt sheave from below.

11. Loosen the nut retaining the belt guide/retainer,

install the belt from the Drive Kit, retighten the
nut, verify the belt clears the guide, and
reinstall the sheave floor.

12. Rest the fan assembly onto the deck end and

slide the pilot thru the 5/8” hole previously
mentioned so that fan assembly is supported
by the pilot and the ¼” stop block welded under
the clamp at the front of the fan assembly.
Note: It may be necessary to swing the
idler pulley away from the assembly
mounting face to clear the chute mounting
bar and the discharge chute mounting tab
on the deck.

13. Reinstall the clamp at the front of the assembly

so that the tab at the lower end of the clamp
passes thru the rectangular slot at the right
front corner of the mower deck, but leave the
fastener loose to ease belt installation.

14. Rotate the belt idler as far forward as possible

and install the belt over the top groove of the
new deck sheave.

15. Tighten the clamp fastener.
16. Using a scribe or other small sharp object,

transfer the mounting hole location at the rear
edge of the fan assembly onto the mating
vertical surface at the right rear of the mower
deck and drill thru with a 25/64” drill.

17. Install the stops on the deck stop pins located

at the rear of the deck then install the new belt
shield.

18. Install the tube support to the main collection

assembly using the 3/8” fastener provided, po-
sitioning so that the tube is 2” to 3” away from
the tire.

19. Install the 7” hose to the fan assembly and the

container input port using the hose clamps
provided.

20. Clamp the tube to the tube support.

5. Attaching a Spindle Drive Assembly

Advertising