Installing sensor – Heath Zenith SL-6105 User Manual

Page 2

Advertising
background image

2

595-4881-09

Typical Installation

1. Remove existing wall switch from junction

box.

2. Connect electrical leads of sensor as shown

in Figure 3. Before installing sensor into
junction box, make sure there is no wire
exposed at each connection.

3. Mount sensor into junction box using two

large mounting screws provided.

4. For test purposes, use a small screwdriver to

turn the TIME control fully counterclock-
wise and the LIGHT control fully clockwise.
Turn the power back on at the circuit breaker.

5. Set mode selection switch to the AUTO

position. When unit stabilizes (about 1
minute), the sensor is ready to detect motion.
If sensor detects motion, the lights will turn
on. The lights will turn off 5 seconds after
motion is no longer detected.

OFF

N

O

AUT

O

T I M E

L I G H T

+

+

Green ground wire to
junction box screw or
grounding wire.

Black

Black

Line
“Hot”

Neutral
Return

Lighting Load

WARNING: Turn power off at the

circuit breaker before wiring.

INSTALLING SENSOR

Removing Control Panel Cover

1. Remove the decorative cover plate (secured

by two small screws).

2. Press in with screwdriver as shown in Figure 2.

Swing control panel cover out to remove.

Mode
Selection
Switch

Control
Panel

Control Panel
Cover

Figure 2 - Removing Control Panel Cover

Figure 3 - Connecting Electrical Leads of Sensor

To Lighting Load

Advertising