Installing stays (anti-vibration measure), Fastening receiver unit to hull unit – Furuno CSH-24F User Manual

Page 13

Advertising
background image

8

Installing stays (anti-vibration
measure)

Install stays from the top of the hull unit to
the ship’s hull. The stays should be angle
iron with a size of 75 x 75 x 9 mm or more
and at least two pieces should be used; one
each to ship’s bow and stern directions. In-
stall if possible, two more stays in ship’s
transverse direction.

Do not install the stays as shown below. Vibration-resistance effect is reduced since vibration is
applied to the stays as rotation force. Install them horizontally.

Figure 3-8 Proper and wrong installation of stay

Fastening receiver unit to hull unit

Fasten the receiver unit to the left side of the hull unit
as shown at right.

A transducer cable protection cover has been fitted
where the receiver unit is to be fastened to the hull unit.
Remove it when mounting the receiver unit.

Raise/Lower
Control Box
(Attached at
factory)

Receiver
Unit

Figure 3-7 Proper installation of stays

90

°

Proper installation

Figure 3-9 Mounting of receiver unit

Advertising
This manual is related to the following products: