Furuno 1623 User Manual

Page 31

Advertising
background image

3. INSTALLATION

23

3. Using the hexagon head bolts, flat

washers and spring washers removed at
step 1, fasten the antenna unit to the
platform. The torque should be 19.6-24.5
N

m.

Flat

washer

Antenna
base

Spring

washer

Platform

Hexagon head bolt
(M10 x 20 or M10 x 25)

*t

Effective
thread
length
15 mm

*t:

Platform thickness

Bolt to use

5 mm or less:

M10 x 20

5-10 mm:

M10 x 25

over 10 mm:

locally supplied bolts

Apply silicone
sealant.

How to fasten the antenna

unit to the platform

4. Unfasten three screws to open the cover.

Release the cable of the rotation detector
from the cable clamp.

Cable
clamp

Rotation
detector

Cable
entrance

Antenna unit, cover removed, top view

5. Referring to the illustration at the top of

the next column for location, unfasten 11
screws to dismount the shield plate.
Discard the screw circled in the
illustration.

Shield plate

Discard this
screw.

Antenna unit, cover removed, top view

6. Pass the antenna cable with connector

through the gasket and cable clamp, and
then tighten cable gland. Two gaskets are
supplied: one gray, one black. Use the
proper gasket according to antenna cable
used, referring to the illustration below.

67

φ

12

49

φ

11

Use gray gasket.

Use black gasket.

Gasket (See below for
type to use.)

Rubber
Gasket

Cable Gland

Antenna unit, top view

Advertising