Selecting a Site

EdgeIron 4802CF units can be mounted in a standard 19-inch equipment
rack or on a flat surface. Be sure to follow the guidelines below when
choosing a location.

◆ The site should:

be at the center of all the devices you want to link and near a
power outlet.

be able to maintain its temperature within 0 to 50 °C (32 to
122 °F) and its humidity within 5% to 95%, non-condensing

provide adequate space (approximately two inches) on all sides for
proper air flow

be accessible for installing, cabling and maintaining the devices

allow the status LEDs to be clearly visible

◆ Make sure twisted-pair cable is always routed away from power lines,

fluorescent lighting fixtures and other sources of electrical
interference, such as radios and transmitters.

◆ Make sure that a separate grounded power outlet that provides 100 to

240 VAC, 50 to 60 Hz, is within 2.44 m (8 feet) of each device and is
powered from an independent circuit breaker. As with any equipment,
using a filter or surge suppressor is recommended.