Foster F40 User Manual

Page 8

Advertising
background image

F20 & F40 A/W Wiring Diagram

7

the service and inspection operations.

IN OPERATION: The unit is running through the freezing and defrost cycle stopping automatically only at full bin situation.

RE-SET/HI TEMPERATURE: To be selected to resume the unit operation when the ice maker shuts off due to the intervention of the condenser

temperature sensor (too high condensing temperature).

The five LEDS, placed in a row in the front of the P.C. BOARD, monitor the following situations:

GREEN LIGHT:

Unit under electrical power

YELLOW LIGHT:

Unit shut-off at full storage bin

RED LIGHT:

Unit shut-off due to hi-condensing

temperature

Blinking:

Unit shut-off due to hi-evaporating

temperature

YELLOW LIGHT:

Unit in freezing operation

YELLOW LIGHT:

Unit in cleaning/rinsing mode

12.6 DIP SWITCH

The P.C. BOARD which controls the entire operation of the ice maker, has a

DIP SWITCH with ten switching keys which allow to set up the

micro processor program in order to extend or to shorten the length of freezing and defrost cycles in relation to the different models and versions

of ice machines.

The DIP SWITCH first four keys setting determines the length of the 2nd phase of freezing cycle (controlled by the electronic timer) as detailed

in Table B.

The DIP SWITCH keys 5, 6 and 7 setting determines the length of the defrost cycle according to the ambient temperature sensor as specified

in table C.

The 8th DIP SWITCH key allows to make a rapid check up of the P.C. BOARD output connections (compressor, water pump, fan motor, water

inlet and hot gas solenoid valves) energizing them in rapid sequence (2 seconds) one by one.

DURING THE AUTOMATIC OPERATION OF THE ICE MAKER THIS KEY MUST BE SET IN OFF POSITION.

ATTENTION: The check up of the P.C. BOARD output must be performed in a very short time in order to avoid frequent starts and stops (every

few seconds) of the electrical components which may damage them, especially the compressor.

The 9th key allows the operation of the water pump even during the defrost cycle. On B 90 it must be set all the time to OFF position.

The 10th key is used to supply power to the water pump during the first 15-20 seconds of the defrost cycle to drain out all remaining water from

the sump tank in the unit equipped with the solenoid drain valve i.e. the KWD drain system.

13. Dip Switch Settings FCI 40-60-85

Dip switch

1

2

3

4

5

6

7

8

9

10

FCI 40

ON

ON

OFF

ON

ON

ON

OFF

OFF

ON

OFF

FCI 40 W

ON

ON

OFF

ON

ON

ON

OFF

OFF

ON

OFF

FCI 60

ON

ON

OFF

ON

ON

ON

OFF

OFF

ON

OFF

FCI 60 W

ON

ON

OFF

ON

ON

ON

OFF

OFF

ON

OFF

FCI 85

OFF

OFF

ON

ON

ON

ON

OFF

OFF

ON

OFF

FCI 85 W

OFF

OFF

ON

ON

ON

ON

OFF

OFF

ON

OFF

Table B

Table C

Table A

18

LENGTH OF TIMED PORTION OF FREEZING CYCLE ACCORDING TO DIP SWITH COMBINATIONS

1

2

3

4

1

2

3

4

1

ON

ON

OFF

OFF

25 min

8

OFF

ON

OFF

ON

11 min

2

OFF

OFF

ON

OFF

23 min

9

ON

ON

OFF

ON

9 min

3

ON

OFF

ON

OFF

21 min

10

OFF

OFF

ON

ON

7min

4

OFF

ON

ON

OFF

19 min

11

ON

OFF

ON

ON

5 min

5

ON

ON

ON

OFF

17 min

12

OFF

ON

ON

ON

3 min

6

OFF

OFF

OFF

ON

15 min

13

ON

ON

ON

ON

1 min

7

ON

OFF

OFF

ON

13 min

LENGTH OF DEFROST CYCLE (IN SEC.) ACCORDING TO THE AMBIENT TEMPERATURE AND TO

DIP SWITCH SETTING COMBINATIONS

5

6

7

0-5°C

5-10°C

10-15°C

15-20°C

20-25°C

25-30°C

30-35°C

35-40°C

ON

ON

OFF

180 sec

150 sec

120 sec

90 sec

90 sec

90 sec

90 sec

90 sec

OFF

OFF

ON

210 sec

180 sec

150 sec

120 sec

120 sec

120 sec

90 sec

90sec

ON

OFF

ON

240 sec

210 sec

180 sec

150 sec

150 sec

120 sec

120 sec

90 sec

OFF

ON

ON

240 sec

210 sec

180 sec

150 sec

150 sec

120 sec

120 sec

120 sec

ON

ON

ON

270 sec

240 sec

210 sec

180 sec

180 sec

150 sec

150 sec

150 sec

Advertising
This manual is related to the following products: