61” blower mount & drive installation – Ferris Industries 1000z Series User Manual

Page 15

Advertising
background image

13

Figure 26. Install Bearing & Spring

A.

7/16-14 x 1-1/2” Bolt

E. 5/16-18 Flange Nut

B.

Bearing

F. 5/16-18 Nylon Lock Nut

C.

7/16-14 Nylon Lock Nut

G. Spring

D.

5/16-18 x 1-1/4” Bolt

Figure 27. Install Support Rail & Spring

A.

Deck Support Rail

C. Spring

B.

5/16-18 x 3/4” Bolt

D. 5/16-18 Nylon Lock Nut

6. Install the bearing (B, Figure 26) on the shaft with

the grease fitting pointing towards the discharge of
the blower. Secure with the four 7/16 x 1-1/2” bolts
(A) and 716-14 nylon lock nuts (C) as shown.
Tighten the setscrew in the collar of the bearing.

7. Install the 5/16” x 1-1/4” bolt (D), 5/16” serrated

flange nut (E) as shown and tighten.

8. Install the spring (G) on the 5/16” bolt (D) on the

blower mount and install the 5/16” nylon lock nut (F).
Only tighten the nuts until the threads come through
the nylon. Do not clamp spring.

9. Install the deck support rail (A, Figure 27) and fasten

with the 5/16-18 x 3/4” bolts (B) and 5/16-18 nylon
lock nuts (D) as shown. Note the direction of the
bolts, this is critical.

10. Install the spring (C) on the idler arm and secure with

the 5/16” nylon lock nut (D). Only tighten the nut
until the threads come through the nylon. Do not
clamp spring.

A

B

C

D

E

F

G

A

B

B

B

D

C

D

D

D

61” Blower Mount & Drive Installation

Advertising
This manual is related to the following products: