1. INSTALLATION

1-3

Radar Antenna

SC-series
Antenna

Bridge

Reception blocked by mast.

Location influenced
by reflected wave.

Example of antenna installed below superstructures

1.1.2

Display unit, processor unit

•

Choose a location where vibration and shock are minimal.

•

Install the units well away from locations subject to rain and water splash.

•

Locate the units away from air conditioner vents.

•

Keep the units out of direct sunlight because of heat that can build up inside
their cabinets.

•

Choose a well-ventilated location.

•

For the display unit, choose a location where it can be easily operated.

•

Leave sufficient space around the units to permit access for maintenance. See
the outline drawing for recommended maintenance space.