Furuno SC-110 User Manual

Page 28

Advertising
background image

1. INSTALLATION

1-18

1.7.2

Fabrication of cables

Cable

Sectional view, fabrication

Power cable
DPCY-1.5
(or equivalent)

Conductor

S = 1.5 mm

φ

= 1.56 mm

2

Armor

Sheath

φ

=

11.7 mm

SECTIONAL VIEW

50

6

Armor

Cut the sheath.

Vinyl tape

Sheath

15

FABRICATION

Crimp-on lug
FV1.25-5

50

Lay in clamp
where paint
was removed.

Cable for IEC 61162
format equipment (JIS
cable TTYCS-1 or
equivalent)

Cable for AD-10
format equipment
((JIS cable TTYCS-1Q
or equivalent)

FABRICATION

80

6

Remove paint
by 50 mm.

Vinyl tape

Shield

15

45

50

Cut vinyl sheath.

Expose core and fold back
shield onto cable.

Lay in clamp
where paint
was removed.

Conductor

S = 0.75 mm

φ

= 1.11 mm

2

Armor

Shield

Sheath

φ

=

10.1 mm

SECTIONAL VIEW (TTYCS-1)

Conductor

S = 0.75 mm

φ

= 1.11 mm

2

Armor

Shield

Sheath

φ

=

11.3 mm

SECTIONAL VIEW (TTYCS-1Q)


Note 1:

Attach labels (supplied) to cables to differentiate between them.

Note 2:

A plastic sheet is placed across the cable glands of the processor unit to keep out

foreign material. Cut out holes in the plastic where cables are to be lead in.






Advertising