3 installing the evaluation mcu – FUJITSU MB2198-130 User Manual

Page 27

Advertising
background image

20

4.3 Installing the Evaluation MCU

Installing the Evaluation MCU

Open the lever of the evaluation MCU mounting IC socket (SC1) to from the solid-line position to
the dotted-line position.

Figure 4.3-1 Installing the Evaluation MCU

Mounting Position

Align pin No. 1 of the evaluation MCU with its pin hole in the evaluation MCU mounting IC socket
(SC1) and insert the evaluation MCU horizontally. (Check this from above.)

Figure 4.3-2 Mounting Position

Install the evaluation MCU on the evaluation MCU mounting IC socket on the adapter board as illustrated in
Figure 4.3-1 to Figure 4.3-3. To uninstall the evaluation MCU, follow the instruction illustrated in Figure 4.3-4.

Evaluation MCU

Evaluation MCU mounting IC socket

M2(SC1)

Evaluation MCU

Evaluation MCU mounting IC socket

pin No. 1

Chapter 4 Connections

Advertising