118 operating manual, Hot-plug components, Bx900 s1 – FUJITSU BX900 S1 User Manual

Page 118

Advertising
background image

118

Operating Manual

BX900 S1

Hot-plug components

©

c

o

gn

itas

. G

es

el

ls

ch

ft f

ür

T

ec

h

ni

k-

Do

ku

m

en

tat

io

n

m

bH

2

01

1

P

fa

d:

C

:\P

rogr

am

m

e

\F

CT

\t

im

_ap

p\

tim

_l

oc

al

\w

ork

\W

A

LT

E

R

\O

B

J_

DO

K

U

-4

95

3-0

07

.fm

I

The two connection blades within a fabric must have the same
technology, i.e. either Ethernet or Fibre Channel or Infiniband or SAS.

When filling the slots in fabrics 2, 3 and 4, also make sure the server blades are
fitted with the appropriate mezzanine cards. The following rules apply for fitting
the mezzanine card slots of the server blades:

●

If a 1 Gb Ethernet mezzanine card is installed in slot 1 of a server blade, at
least one 1 Gb Ethernet connection blade must be installed in fabric 2 of the
system unit.

●

If a 10 Gb Ethernet mezzanine card or a 10Gb CNA mezzanine card is
installed in slot 1 of a server blade, at least one 10 Gb Ethernet connection
blade must be installed in fabric 2 of the system unit.

●

If an FC mezzanine card is installed in slot 1, at least one FC connection
blade must be installed in fabric 2.

●

If an Infiniband mezzanine card is installed in slot 1, an Infiniband connection
blade must be installed in fabric 2.

I

In this case, only one of two channels of the Infiniband mezzanine
card is used.

●

If a 1 Gb Ethernet mezzanine card is installed in slot 2 of a server blade, at
least one 1 Gb Ethernet connection blade must be installed in fabric 3 or in
fabric 4 of the system unit.

●

If a 10 Gb Ethernet mezzanine card or a 10Gb CNA mezzanine card is
installed in slot 2 of a server blade, at least one 1 Gb Ethernet connection
blade must be installed in fabric 3 of the system unit.

●

If an FC mezzanine card is installed in slot 2, at least one FC connection
blade must be installed in fabric 3.

●

If an Infiniband mezzanine card is installed in slot 2, Infiniband connection
blades should be installed in fabrics 3 and 4.

I

In this case, both channels of the Infiniband mezzanine card are
used.

●

If a SAS mezzanine card is installed in slot 2, at least one SAS connection
blade must be installed in fabric 3.

●

You can install combinations of FC, Ethernet, Infiniband and SAS
mezzanine cards in a server blade. In this case, the mezzanine card slots
may be equipped as follows.

Advertising