1a 1b 1a 1a, 6step 1 – main frame assembly, Step 2 – foot platform assembly – Fitness Quest 9.5e User Manual

Page 7

Advertising
background image

6

STEP 1 – Main Frame Assembly

a) Remove the Allen Bolts, Washers,

Nuts and Nut Caps from the Foot
Base on the Main Frame Assembly.

Slip the Roller Tubes onto the Main
Frame making sure the Roller Tracks
are facing up and the Bolt Holes on
the rear of the Roller Tubes are facing
each other. To secure the Roller
Tubes to the Base Frame replace
the Bolts and Washers you just
removed.

b) Remove the Allen Bolts and Washers

from the rear of the Roller Tubes. Place
the Stabilizer Bar (with the Warning
Label up) between the Roller Tubes.
Replace the Bolts and Washers you
just removed.

c) Tighten all bolts with Wrench provided.

right

roller tube

left

roller tube

roller tracks

foot

base

main

frame

assembly

stabilizer

bar

remove bolts

and washers

1a

1b

1a

1a

STEP 2 – Foot Platform Assembly

NOTE: The Foot Platforms are interchangeable

a) Remove the Allen Bolts, Washers and Nylon Nuts from

the bottom of the Foot Platform.

b) Note: This Step might be easier if you have a second

person hold the Foot Tube or Foot Platform steady as
you slide the Foot Platform on and secure it.
Position the Crank in the down stroke and carefully
slide the Foot Platform Assembly onto the Front Foot
Tube. Replace the Bolts and Washers you just removed
in step (a). Tighten with Wrench provided.

c) Carefully lay the Foot

Platform down so the
Roller seats itself into
the Roller Track on the
Roller Tube.

Repeat on other side.

front

foot tube

foot

platform

assembly

main

frame

connecting

arm

crank

(in down

stroke)

2b

Roller should

seat itself in

track

2c

Advertising