Gto t, Owering, Ystem – GTO SL-1000 User Manual

Page 19

Advertising
background image

16

P

OWERING

T

HE

S

YSTEM

Make sure the control box power switch
is in the OFF position.

ON-OFF

OFF

C

ONNECTING

THE

B

ATTERY

I

NSTALLATION

OF

THE

GTO T

RANSFORMER

S

TEP

8

Unscrew and remove the front cover of the control box and slide battery into
position with its terminals to the left (see illustration). Make sure the battery
fits snugly in control box.

Connect the black battery lead to the negative () terminal,
and the red battery lead to the positive (+) terminal. DO
NOT
allow battery leads to touch the control board!
Touching the control board with battery leads can short
circuit the system!

HINT: a dab of household petroleum jelly on
each terminal will help prevent corrosion.

RED WIRE

to positive (+)

BLACK WIRE

to negative (–)

Choose the electrical outlet into which the transformer will be plugged. Measure the distance from the electrical
outlet to the control box, following the path where the low voltage wire will run (the maximum distance can be no
more than 1000 ft.)
.

NOTE: Transformer must be connected with no more than 1000 ft. of 16 gauge multi-stranded, dual conductor,
direct burial low voltage wire.

Predicting the exact maximum number of operational cycles at peak load is more of an art form than an exact science.
The charts below illustrate the average maximum number of cycles (the “MNC”) in a 24 hour period on a typical
single gate, and is installed such that the motor draws 10 amperes to move the gate.

1) The MNC for the GTO/PRO SL-2000 is roughly comparable to most AC powered operators, and the transformer

provided with this operator should handle most high traffic situations. If the battery does not seem to be able to
provide the constant charge required for your application, the addition of the GTO/PRO 24 Amp Hour Battery
Kit (see Accessoy Catalog) should provide ample power to handle any situation. For more information, call
GTO’s service department at 1-800-543-1236.

Gate Weight

Gate Opening

Gate Capacity Chart for SL-1000 Series

(estimated number of cycles based on use with a transformer)

20 ft.
16 ft.
12 ft.

8 ft.

120
140
160
180

200 lb.

110

130
150
170

300 lb.

100
120
140
160

400 lb.

90

110
130
150

500 lb.

Gate Weight

Gate Opening

Gate Capacity Chart for SL-2000 Series

(estimated number of cycles based on use with a transformer)

20 ft.
16 ft.
12 ft.

8 ft.

80

100
120
140

400 lb.

70

90

110
130

600 lb.

60
80

100
120

800 lb.

50
70
90

110

1000 lb.

NOTE: Cycles shown are for single gate, dual gates will get approximately half as many cycles.

Advertising