Installation instructions, Important, Step 1 move refrigerator indoors – GE FREE-STANDING SIDE-BY-SIDE STAINLESS STEEL ZFSB23D SS User Manual

Page 5

Advertising
background image

Installation Instructions

5

STEP 1 MOVE REFRIGERATOR

INDOORS

IMPORTANT:

Door and passageways into

the installation location require a 36" min. opening. If
the opening is less than 36", the top cap and doors may
need to be removed.

NOTE:

Skip this step if door removal is not required.

See instructions on next page, “To Move The
Refrigerator Indoors."

REMOVE THE DOORS

The top cap must be removed to access hinges. It is best
to remove one door at a time.
A. Remove two screws on top of the refrigerator, one on

each side.
Push the top cap forward and lift up from the rear.

B. Remove 2 screws holding the top filler strip, lift off.
C. Open both doors. Remove the 2 toekick screws and

pull forward to remove.

D. Disconnect the water line coupler by pushing against

the collar on the left side. Disconnect wire harness.

E. Remove 2 screws holding top hinge to the case.

Carefully, lift off door.

Follow the same procedure to remove the fresh food
door.

Water Line Coupler

A

B

Hinge Screws

Wire Harness

Toekick Screw

E

D

C

To prevent damage, leave inside

packaging, door spacer and outside

protective wrap in place until the unit

is moved to the installation location.

Advertising