Boom load positioning instructions, Maximum load centers – Genie SUPERLIFT 33547 User Manual

Page 19

Advertising
background image

Part No. 33547

Genie Superlift Contractor

17

Operator's Manual

First Edition • Ninth Printing

LOAD CAPACITY CHARTS

lbs
kg

lbs
kg

lbs
kg

lbs
kg

SLC-6

SLC-12

SLC-18

SLC-24

inches
cm

Load Capacity Chart

Load Center

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

36

41

46

51

56

61

66

71

76

81

86

91

97

102

107

Model

650

610

565

515

470

425

385

350

315

285

260

235

215

195

180

295

277

256

234

213

193

175

159

143

129

118

107

98

89

82

650

610

565

515

470

425

385

350

315

285

260

235

215

195

180

295

277

256

234

213

193

175

159

143

129

118

107

98

89

82

650

610

565

515

470

425

385

345

310

275

250

225

200

180

160

295

277

256

234

213

193

175

157

141

125

113

102

91

82

73

650

610

565

515

470

425

385

345

310

275

250

225

200

180

160

295

277

256

234

213

193

175

157

141

125

113

102

91

82

73

Boom

Load Positioning Instructions

1 Determine the weight of the load and the

location of its load center.

2 Refer to the chart below to determine if the

machine is capable of lifting the weight at the
location on the boom.

3 Secure the load to the lifting shackle on the

boom.

measure to the load center

18 in

46 cm

24 in

61 cm

42 in

107 cm

32 in

81 cm

Maximum Load Centers

(measure from the front of the carriage)

Standard Forks

24 in

61 cm

Adjustable Forks

24 in

61 cm

Boom

42 in

107 cm

Load Platform

24 in

61 cm

Pipe Cradle

18 in

46 cm

Fork Extensions

42 in

107 cm

Advertising